Luohe Orange Mechanical Equipment Co., Ltd

Specialized in design, produce, sales, installation and after sales support of food machine

Two Phase Folded Water Well Drilling Rig

Two phase folded water well drilling rig mainly used for geothermal drilling, farm irrigation , house yard, gardens and water well drilling, drilling diameter is 70-350mm, and drilling depth is 80m to 100m. It also can be used in small building piling, like farmhouse or factory, the drilling diameter can reach 500mm and depth can be more than 100 meter.

Send Inquiry
Product Details

 The advantage of two Phase Folded Water Well Drilling Rig:

1. The two phase electric folded type water well drilling rig has light weight, and is energy saving. 
2. The two phase electric folded type water well drilling rig is a patented product, with unique design and simple drilling structure; 
3. The two phase electric folded type water well drilling rig is easy to transport and can learn how to handle the machine in short time; 
4. The two phase electric folded type water well drilling rig can drill through hard stratum, unless thick rock layer ;  
5. The two phase electric folded type water well drilling rig can realize one person operation and reduce the labor intensity ;  
6. The two phase electric folded type water well drilling rig has high efficiency and it can work fast.
7. We can assure easily operation and long life service life, free maintenance. 

7.jpg

The Whole Set of two phase folded water well drilling rig:

图片6.png


Completed unit of two phase folded water well drilling rig include main engine, tools, 40 meter drill rod, 2 units alloy drilling bit, 1 unit high pressure water pump, 4 meter high pressure water pipe, 1 unit 60V transformer and English manual.


Technical Parameters of two phase folded water well drilling rig:

Model of drilling machine

HY-180

Drilling machine overall dimension(mm)

700*700*2500

Weight of Drilling machine (kg)

120

Drill rod diameter (mm)

Ø42

Drill rod length(mm)

1500

Rod change method

Full automatic screw thread

Drilling depth(m)

80

Voltage(V)

220V

Motor power (KW)

DC60V, 1.5KW~2KW

Drilling method

Percussive and rotating type

Pump power (KW)

2.2KW

Drilling hole diameter(mm)

Within Ø 200

Hosting height(mm)

2000

Hosting capacity (kg)

500

Completed unit of drilling machine include main engine, tools, 40 meter drill rod, 2 units alloy drilling bit, 1 unit high pressure water pump, 4 meter high pressure water pipe, 1 unit 60V transformer and English manual.

Installation Instruction  of two phase folded water well drilling rig:


图片3.png

Operating Essentials of  two phase folded water well drilling rig:


1. Site selection

Chose the location of the well, select the wellhead position, dig deep 30 to 50cm with a shovel, the well diameter of 10-30cm.Move the mounting bracket to the top of the well head in alignment. Generally the surface of the earth of the location of the well requires solid density, there are no bricks, stones, and firewood below. In order to avoid the seepage, collapse and subsidence of the drilling operation, avoid security risks.

 

2. Dig reservoirs

Dig a reservoir which diameter is more than 1.5 square meters and depth of one meter at the place about four meters away from the wellhead(also can determine the distance according to the actual terrain, the length of the water pipe).Use a wooden pole to lift the pressure pump across the sink(It is appropriate to cover the water pump with water plane),connect the other end of the pump pipe to the faucet of the drilling machine.

 

3. Starting up

   Link the drill to the drill rod, the main machine lift up the machine head, the other person fits the first drill rod with the drill bit. The main controller lift slowly down the machine head, the other person works with the hand driller slowly through the base hole into the well drilling hole, vertical centering. Start the drilling machine and pump, the drill rod turns and goes underground. Be sure to keep in mind: The drill is rotated clockwise when drilling, unidirectional, in case the drill rod disconnects.

 

4. Install and exchange drill rod

After drilling the first drill rod, the other person close off safety clasp, plug unloading rod fastener. The main control machine reverse to rotate drill rod counterclockwise, the lifting head is separated from the drill rod, lifting the machine head, the other person take another drill rod, Manually rotating top thread connecting machine head, connect the bottom joint. The main control machine is turned on clockwise to tighten the drill rod, open safety, remove unloading rod fastener, turn on clockwise rotation, continue to drill down. Repeat the above actions over and over again. Find the ideal water-bearing geological sand layer according to the depth you want.

 

5. Disassemble/ Unload the drilling rods

When drilling down to the ideal depth of aquiferrecord the depth of the water-bearing sand layerstop the drilling and only start the water pump to pump water to clean the well, flush all the mud and sand out of the well, then start disassembling the rods. Firstly, close the safety clasp and plug unloading rod fastener, separate the machine head from the drill rod by rotating counterclockwise. Secondly, install the unloading rod device on the machine head tightly, slowly go down the machine head until the unloading rod device fit the drilling rod at the bottom base, rotate and lock, then lift. Stop until the drilling rod bottom joint is lifted above the base safety clasp, close the safety clasp and plug unloading rod fastener, rotate counterclockwise, the drilling rod will be disassembled automatically, the other person remove the drilling rod. Repeat the above actions.

 

NOTE:  When remove the last drilling rod with the bit, to avoid scratches, remember power off the machine and remove it manually, and slowing lift it up from the bottom base.


Routine Maintenance Tips of two phase folded water well drilling rig:

1. Please handle with care during the moving of the machine, avoid rain splash.

2. The motor wires cannot be contacted with each other in case of electricity connection.

3. Check the steel cable quality for necessary exchange.

4. Before or after the use of the drilling rod, use lubricating oil to prevent rust.

5. The motor cannot work overload for a long time.

6. Check the circuit and transformer safety device if the motor doesn’t work.

 




Hot Tags: two phase folded water well drilling rig, China, manufacturers, factory, cheap, customized
Related Products
Inquiry